Deployment failed for project rac with the following error:
| 1 | Resource is limited - try again in 1 day (more than 100, code: "api-deployments-free-per-day"). |
Learn More: https://vercel.com/knewton?upgradeToPro=build-rate-limit
Problem. The maintainer wants a record of an idea for much later, with no date: two layouts for spaces and profiles that people can switch between.
Change. Two docs lines, no code:
docs/roadmap.md, under Later: today's layout (each profile in its own window, each profile with its own spaces) stays the default. A second, more Arc-like layout would use one window where each space picks a profile, the same one or a different one, so choosing a profile never opens a new window.VISION.md, under Not planned for now: one bullet pointing at the roadmap entry.Verified. Docs only. No patches touched, so net-diff hunks: 0.
🤖 Generated with Claude Code (Claude Sonnet 5.5)
Note
Low Risk Documentation-only changes with no code, behavior, or release impact.
Overview Documents a future, optional second layout for spaces and profiles—no implementation and no timeline.
docs/roadmap.md (Later): Adds that users could eventually switch between today's shipped model (one window per profile, spaces per profile) and an Arc-like single-window model where each space selects a profile without opening a new window. The current layout stays the default until that exists.
VISION.md (Not planned for now): Adds a bullet that points readers to that roadmap entry so the idea is recorded without implying it's on the near-term plan.
Reviewed by Cursor Bugbot for commit 0bfb0fe7175c7025277c8bc30f06b9b4da351975. Bugbot is set up for automated code reviews on this repo. Configure here.
Added 1 commit
Deployment failed for project rac with the following error:
| 1 | Resource is limited - try again in 1 day (more than 100, code: "api-deployments-free-per-day"). |
Learn More: https://vercel.com/knewton?upgradeToPro=build-rate-limit
Your OpenCode Zen account is out of credit. Top it up, then re-trigger Pullfrog.
| 1 | provider error: Upstream request failed: Insufficient account funds |
Pullfrog | Rerun failed job ➔ | View workflow run | via Pullfrog | Using kimi-k3
Deployment failed for project rac with the following error:
| 1 | Resource is limited - try again in 24 hours (more than 100, code: "api-deployments-free-per-day"). |
Learn More: https://vercel.com/knewton?upgradeToPro=build-rate-limit
Important
Auto reviews are disabled on this repository. Please check the settings in the CodeRabbit UI or the .coderabbit.yaml file in this repository. To trigger a single review, invoke the @coderabbitai review command.
be6de06c-30f7-426f-a3ff-9e9c792e7491You can disable this status message by setting the reviews.review_status to false in the CodeRabbit configuration file.
Use the checkbox below for a quick retry:
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.
Comment @coderabbitai help to get the list of available commands.
Bugbot is counted against Cursor usage for this user or team, and this run hit a usage or spend limit.
A user or team admin can review and increase usage limits in the Cursor dashboard.
(requestId: 466f1beb-aee1-4b9a-9d6f-55b66c92f652)
Devin Review analyzed this PR and found no bugs or issues to report.
[Low impact] This documentation-only change appears safe to merge.
Records an optional, Arc-like layout as an undated future idea.
Reviews (1) · Last reviewed commit: "docs: note a second, Arc-like layout for..." · Reviewed by Greptile