Milestones
Group issues and pull requests toward a shared target.
0.3.0No due date
Must fix before cutting 0.3.0. From the pre-0.3 triage.
100%0 open68 closed
backlogNo due date
Untargeted follow-ups, each with a severity label. Pull into a release milestone when picked up.
33%169 open83 closed
Railway exitNo due date
Move Ployz hosted stack off Railway onto np1 (Uncloud) + small EC2 uptime agents. Tools-api DB to PlanetScale.
100%0 open1 closed
0.3.1No due date
Follow-up to 0.3.0: deferred from 0.3.0 triage (off the happy path).
100%0 open40 closed
0.3.3No due date
Follow-ups after 0.3.1 (medium/low from the beta.7 soak and later)
99%1 open178 closed