Fixes #54772 When "Workspace: close project" was used in a multi-project window, the handler pre-created an empty "get started" workspace and activated it before removing the old project group. This prevented `remove_project_group` from detecting that the active workspace was being removed, so the neighbor-fallback never ran — leaving the user on the empty workspace even though other projects were still open. The fix delegates entirely to `remove_project_group`, which already handles: - Computing a neighboring project group - Prompting for unsaved changes via `prepare_to_close` - Activating the neighbor (or creating an empty workspace if none remains) This matches the behavior of the sidebar "Remove Project" action, which uses the same `remove_project_group` path. Release Notes: - Fixed "Workspace: close project" action not switching to another project in multi-project workspace --------- Co-authored-by: Eric Holk <eric@zed.dev>
1 file changedLine totals unavailable