docs/plan/02-pre-upload-readiness.md
Follow-up work
These tasks do not block the first complete transfer.
- Add schema-rejection and interrupted-first-request checks for RPC.
- Extend CI with browser/runtime smoke checks and failure injection when there are stable product flows to exercise. Run tests when they exist; do not claim empty runs as coverage.
- Verify Kobalte or form-adapter compatibility when an upload screen needs those controls. Avoid preparing an unused component library.
- Revisit dependency patches when the relevant upstream fixes are released.
- Inspect and remove orphaned pre-migration infrastructure separately after confirming it contains no required data.
Record implementation evidence in PRs and remove completed items here.