docs/plan/02-pre-upload-readiness.md

Follow-up work

These tasks do not block the first complete transfer.

  • Add schema-rejection and interrupted-first-request checks for RPC.
  • Extend CI with browser/runtime smoke checks and failure injection when there are stable product flows to exercise. Run tests when they exist; do not claim empty runs as coverage.
  • Verify Kobalte or form-adapter compatibility when an upload screen needs those controls. Avoid preparing an unused component library.
  • Revisit dependency patches when the relevant upstream fixes are released.
  • Inspect and remove orphaned pre-migration infrastructure separately after confirming it contains no required data.

Record implementation evidence in PRs and remove completed items here.