Close the recorded openings Dara ruled solid from in-game views

Dara swiped through the 119 pieces whose recorded open decision the 3D
scene disagrees with, looking at a render from the spot that sees through
each one. 51 become solid at the measured heights: the Abyss atrium wall
sections the 2026-09-14 review left open beside the eleven it confirmed
(all now 3.96-8.0 m), both Fracture corridor openings and Haven defense's
gameplay opening. Haven, Icebox and Pearl door and corridor openings stay.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
deece3f3c5Dara Adedeji committed on 10/3/2026, 5:04:21 AMparentef0cbab
7 files changedLine totals unavailable