# Keep the walls above Pearl's tunnel; withdraw the void seal · dara/icarus

[View on GitCafe](https://git.cafe/dara/icarus/commit/3c5f4cb97d0dd7b26055debb505b7eabfc5c60af)

Repository: [dara/icarus](https://git.cafe/dara/icarus)

Visibility: public

Requested revision: 3c5f4cb97d0dd7b26055debb505b7eabfc5c60af

Requested commit: 3c5f4cb97d0dd7b26055debb505b7eabfc5c60af

Commit: 3c5f4cb97d0dd7b26055debb505b7eabfc5c60af

Tree: 14783e38c310ccbdf91588b4fcc94b9b45c59810

Author: Dara Adedeji

Committer: Dara Adedeji

## Message

```
Keep the walls above Pearl's tunnel; withdraw the void seal

Dara's review of the previous change: the ramp down into the B Hall tunnel
is walled on both sides, so from the platform above you cannot see east
over the tunnel. The horizontal probe read nothing above the ceiling there
and the re-measure trusted it; the tunnel review's blanket was right. The
re-measure is withdrawn, and with it the void seal that only existed to
stop the leak the re-measure opened. Both scripts stay unapplied.

The west mouth stays open under its 7 m header, which Dara confirmed. The
tunnel and Breeze tests return to their reviewed expectations.

Gate: all tests pass.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>

```

## Parents

- [9c8d964326633986803392312dac336cb7ca7dcd](https://git.cafe/dara/icarus/commit/9c8d964326633986803392312dac336cb7ca7dcd?format=markdown)

[Source at this commit](https://git.cafe/dara/icarus/tree/3c5f4cb97d0dd7b26055debb505b7eabfc5c60af?format=markdown)
