Dara's review of the previous change: the ramp down into the B Hall tunnel is walled on both sides, so from the platform above you cannot see east over the tunnel. The horizontal probe read nothing above the ceiling there and the re-measure trusted it; the tunnel review's blanket was right. The re-measure is withdrawn, and with it the void seal that only existed to stop the leak the re-measure opened. Both scripts stay unapplied. The west mouth stays open under its 7 m header, which Dara confirmed. The tunnel and Breeze tests return to their reviewed expectations. Gate: all tests pass. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Dara Adedeji committed on 9/19/2026, 8:26:15 PMparent9c8d964
31 files changedLine totals unavailable